27 years of magnetic manufacturing experience · Since 1999 services@china-empire.com WhatsApp +8613805876186
Quality assurance

Quality You Can See Before We Ship

In addition to agreed inspection reports, pre-shipment inspection video can let customers remotely see the actual product, inspection process and real readings before shipment.

Quality Assurance & Pre-Shipment Inspection Video | Ningbo Empire
Define

Align the critical characteristics

Inspection requirements are defined against the drawing, specification, operating risk and agreed project scope.

Measure

Inspect the actual product

Applicable dimensions, magnetic characteristics, appearance, coating or assembly attributes are checked using the agreed method.

Share

Make the evidence visible

Reports, traceability references and real-time video can let remote teams review actual parts and readings before disposition.

BuildProductionManufacture to the released drawing and process route.
InspectFinal InspectionCheck the agreed characteristics on the actual product.
ShowReal-Time VideoPresent parts, equipment, process and live readings when agreed.
VerifyCustomer ReviewEnable remote review before the final disposition.
RecordInspection ReportProvide the agreed formal shipment record.
ReleaseShipmentShip after the agreed evidence path is complete.

Need a custom inspection plan?

Tell us which characteristics matter most to your application. We can align inspection reporting and video verification around the project.

Start Engineering Review
Evidence matrix

Agree what matters before we measure it.

The applicable evidence depends on the product, drawing, risk and customer requirement. No single inspection package is presented as universal.

EvidenceWhat it can showHow it is applied
Dimensional and visual inspectionSpecified dimensions, tolerances, appearance, quantity or other agreed physical characteristics.According to the released drawing and agreed inspection plan.
Magnetic verificationApplicable magnetic characteristics, orientation, surface field or assembly performance.Test method and acceptance criteria are aligned for the project.
Real-time inspection videoThe actual parts, measuring equipment, process and live readings before shipment.Available when requested and agreed for the order.
Shipment inspection reportA formal record of agreed results, sample quantity and final disposition.Available according to agreed project requirements.
Traceability referencesConnections among PO, batch, production and inspection records.Applied to the traceability scope defined for the project.
Quality Assurance engineering visual 1 Quality Assurance engineering visual 2